CFI Lease Area

STATUS
RRSE RatingContaminants
LowVanadium Pentoxide
Media of ConcernCompleted IRP Phase
Soil, GroundwaterRFA, CS, RFI/CMS
Current IRP PhaseFuture IRP Phase
LTMLTM

Helpful Links

  Contact Information
  Site List
  Calendar
  History
  Links
  Public Participation Opportunities
  News Articles
  Other Information

SITE DESCRIPTION

Site VAAP-18 is located east of the new TNT production facilities and consists of two acres containing two marked, unlined burial areas. The first of these areas contained approximately 70,000 pounds of vanadium pentoxide buried in drums.

Remedial action for the vanadium pentoxide area was completed in 1999 - 2000. A draft removal action report documenting removal and nature and extent of any remaining contamination was completed in April 2002. The removal action report was finalized and approved in December 2003. The vanadium pentoxide area of VAAP-18 is response complete.

The second area contains approximately 107 tons of double-bagged asbestos pipe insulation. The burial of asbestos at the burial ground was previously approved by the State of Tennessee.

Groundwater sampling was performed in 1994 and 2000.

PROPOSED PLAN

As currently envisioned, a deed restriction and land-use controls will be required for the asbestos burial ground. However, in light of property transfer considerations, it has been suggested that the asbestos be removed from the burial ground and disposed of in an off-site landfill, thereby eliminating the need for land use controls for VAAP-18. In response to requests from the USEPA and TDEC, the cost-benefit for both options (remain in place with LUC versus removal) will be evaluated including long-term maintenance of the burial ground before a final decision is made.